The action essentials of removing the support after the pe pipe hot melt


Release time:

Nov 01,2019

1. Before the formwork support is removed, the concrete strength must meet the design requirements and can only be carried out after being declared and approved. Demolition of the template is generally done with a long pry, and people are not allowed to stand on the template being dismantled. When dismantling the floor template, attention should be paid to the fall of the whole template, especially when the qualitative template is used as the platform template, more attention should be paid to prevent the template from suddenly falling and hurting people. 2. When removing the formwork, a warning area must be set up and someone must be assigned to monitor it. Formwork removal must be thoroughly removed, and no suspended formwork shall be retained. The removed formwork shall be cleaned in time and stacked neatly. The removed formwork and support shall be transported to the ground with vertical lifting equipment, and no littering shall be allowed.

1. Before the formwork support is removed, the concrete strength must meet the design requirements and can only be carried out after being declared and approved. Demolition of the template is generally done with a long pry, and people are not allowed to stand on the template being dismantled. When dismantling the floor template, attention should be paid to the fall of the whole template, especially when the qualitative template is used as the platform template, more attention should be paid to prevent the template from suddenly falling and hurting people.

 
2. When removing the formwork, a warning area must be set up and someone must be assigned to monitor it. Formwork removal must be thoroughly removed, and no suspended formwork shall be retained. The removed formwork shall be cleaned in time and stacked neatly. The removed formwork and support shall be transported to the ground with vertical lifting equipment, and no littering shall be allowed.
 
3. When removing the formwork, the temporary scaffold must be firm, and the removed formwork shall not be used as the scaffold board.
 
4. Scaffolding must be firm and smooth, and no air drop is allowed to prevent falling.
 
5. When the removed steel mold is used as the bottom mold of the platform, the top support shall not be removed completely at one time. The top support shall be removed in batches, and then the joist and bottom mold shall be removed in sequence to avoid one-time large surface and falling off of the steel mold under self-weight load.
 
6. The concrete strength when the prefabricated formwork is removed shall meet the design requirements; when there are no specific requirements in the design, the following provisions shall be met:
 
1) The side formwork can be removed only when the strength can ensure that the components are not deformed and the edges and corners are complete;
 
2) The core mold or the inner mold with reserved holes can be removed only after the concrete strength can ensure that the surface of the component and the hole does not collapse and crack.
 
3) bottom formwork, when the span of the component is not more than 4m, can be removed only after the strength meets the requirement of 50% of the designed concrete standard value: when the width of the component is more than 4m, can be removed only after the concrete strength meets the requirement of 75% of the designed concrete strength standard value.
 

The Importance and Advantages of PE Pipe in Water Supply Project

To learn more about the advantages of PE pipes in water supply projects, please read the details of this article.

2023-10-04

Shandong yushun pipeline engineering company limited: professional to provide high quality of PE pipe

Shandong yushun pipeline engineering limited company provide you with high quality pe pipe, to ensure the safety of water quality and water supply stability. Whether in the new project or in the old pipeline repair and replacement, Yushun pipeline can provide you with high-quality products and professional services. Choose Yushun pipeline, let us contribute to the development of the construction industry together!

2023-09-24

PE pipe manufacturers how to choose? Shandong water pipe recommended

Shandong water pipe manufacturers with its high-quality products, strong production capacity and excellent after-sales service has been widely concerned. Choose Shandong water pipe manufacturers, you will get satisfactory results to ensure the smooth progress of the project.

2023-09-14