The action essentials of removing the support after the pe pipe hot melt
Release time:
Nov 01,2019
1. Before the formwork support is removed, the concrete strength must meet the design requirements and can only be carried out after being declared and approved. Demolition of the template is generally done with a long pry, and people are not allowed to stand on the template being dismantled. When dismantling the floor template, attention should be paid to the fall of the whole template, especially when the qualitative template is used as the platform template, more attention should be paid to prevent the template from suddenly falling and hurting people. 2. When removing the formwork, a warning area must be set up and someone must be assigned to monitor it. Formwork removal must be thoroughly removed, and no suspended formwork shall be retained. The removed formwork shall be cleaned in time and stacked neatly. The removed formwork and support shall be transported to the ground with vertical lifting equipment, and no littering shall be allowed.
1. Before the formwork support is removed, the concrete strength must meet the design requirements and can only be carried out after being declared and approved. Demolition of the template is generally done with a long pry, and people are not allowed to stand on the template being dismantled. When dismantling the floor template, attention should be paid to the fall of the whole template, especially when the qualitative template is used as the platform template, more attention should be paid to prevent the template from suddenly falling and hurting people.
The Importance and Advantages of PE Pipe in Water Supply Project
2023-10-04
2023-09-24
PE pipe manufacturers how to choose? Shandong water pipe recommended
2023-09-14